Construction Activity — February 2013

i 215 cidh pile concrete being placed i 215 cidh piles 607 to 614 was cast with 8 inch slump concrete i 215 cidh piles concrete being paced at cap i 215 sw 685 hayward baker mobilized today 021913 tp concrete debris at n bound created from the bridge demo at perris blvd stage 1 2 20 13 excavation temporary parking 549 n d st 003 installing steel cable between corbel and caps temp falsework at perris blvd temporary parking area sta 15 50 549 n d st 001